Sign In | Join Free | My himfr.com
Home > Steel Structure Hangar >

Prefabricated Metal Aircraft Hangars Painted Galvanized Surface

Qingdao Xinguangzheng Xinyuan Construction Engineering Co., Ltd.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now
    Buy cheap Prefabricated Metal Aircraft Hangars Painted Galvanized Surface from wholesalers
     
    Buy cheap Prefabricated Metal Aircraft Hangars Painted Galvanized Surface from wholesalers
    • Buy cheap Prefabricated Metal Aircraft Hangars Painted Galvanized Surface from wholesalers
    • Buy cheap Prefabricated Metal Aircraft Hangars Painted Galvanized Surface from wholesalers

    Prefabricated Metal Aircraft Hangars Painted Galvanized Surface

    Ask Lasest Price
    Brand Name : XGZ
    Model Number : XGZ-SSH006
    Certification : CE EN1090,ISO9001
    Price : USD 30-100 per square meter/Negotiable
    Payment Terms : T/T, L/C, Western Union, MoneyGram
    Supply Ability : 15000 tons per month
    Delivery Time : 30-55 days
    • Product Details
    • Company Profile

    Prefabricated Metal Aircraft Hangars Painted Galvanized Surface

    Maximum Efficiency And Cost-Effectiveness For Prefabricated Steel Structure Hangar


    Product Description


    Prefabricated steel structure hangar is one of the innovative technologies in building construction solutions. Its econimical price, convinient tranportation and quick installation make it more and more polular in construction area.
    Prefabricated steel structure hangar is usually component by H steel column, H steel beam, purlin, roof sheet, wall sheet, rolling door and windows, etc. All of main structure part (H column & beam) will be fixed by high strength bolts and the purlin will be fixed on the column and beam by 4.8S bolts, which makes the workshop frame erection faster than traditional concrete construction system. It’s roof and wall is steel sheet or sandwich panel, which is lighter and spend less time to erect.


    Product Specification


    Components of steel structure hangar
    ● Primary Framing Elements
    Columns, beams members are made by H section steels( hot rolled section steel/ welded section steel), which will be easily bolted together at site. A factory primer and facing paintings or galvanization surface treatment are applied to get better anti-rusting effect of primary framing elements.
    ● Secondary Framing Elements
    Purlin, tie bar are formed as secondary framing, which will fix on columns and beams by common bolts.
    ● Bracing
    Round steel is supplied with knee bracing and other supporting parts that need portal framing, which will improve the stability and durability of the whole structural hangar.
    ● Cladding
    Roof and Wall are covered by color-coated corrugated steel sheet or steel sandwich panel, hot dipped with zinc and aluminum compound, that is fixed to the outside of structural building to protect it against bad weather or to make it look more attractive and last for generations.
    ● Windows and Doors
    Plastic Steel Window/Aluminum-alloy Window; Sliding Door/Folding Door.
    ● Other Options:
    Gutter, Downpipe, Transparent sheet, Ventilator and Bridge Crane will be fitted according to client’s requirements.

    NameSteel Structure Hangar
    SizeCustomized according to customer needs
    Main Steel

    Q355, Q235B etc.

    Column&BeamWelded or Hot rolled H-section
    Wall/RoofSandwich panel(EPS/PU/glass wool)/steel tile
    DoorRolled up door or sliding door
    WindowPlastic steel or aluminum alloy window
    ConnectionWelding connection or bolt connection
    SurfaceHot dip galvanized or painted(can be customized)
    Crane5MT, 10MT, 15MT and more

    Prefabricated Metal Aircraft Hangars Painted Galvanized Surface


    Features Of Steel Structure Hangar


    Compared with traditional concrete buildings, steel hangars have numerous advantages

    1. Steel structure has light weight;
    2. Steel structure has good seismic and impact resistance;
    3. Steel structure manufacturing is highly industrialized;
    4. Steel structures can be assembled accurately and quickly;
    5. The hangar steel structure can be recycled after disassemble;
    6. Steel structure hangar construction peroid is short.


    Design and Quotation


    We can help your idea drawing come true, if not drawing yet, after clear on the following infos, we can prepare drawing accordingly for you.

    1. Location: Specify project site location, country and city.
    2. Dimensions: Provide overall dimensions (length, width, eave height).
    3. Mezzanine: Indicate if mezzanine is required. If yes, provide load per square meter.
    4. Wall Type: Choose between single-layer steel sheet or sandwich panel wall.
    5. Snow Load: Specify snow load requirements, if applicable.
    6. Wind: Provide wind speed/load requirements.
    7. Interior Column: Determine if interior columns are allowed.
    8. Overhead Crane: State if overhead crane is needed and specify capacity.
    9. Additional Requirements: Note any specific or unique requirements for the project.

    Prefabricated Metal Aircraft Hangars Painted Galvanized Surface


    Product Processing


    When steel components are processed in factories, they are mainly divided into the following steps:

    1. Material Preparation

    Steel materials, such as beams, columns, and plates, are received and inspected for quality. They are organized and prepared for further processing.

    2. Cutting and Shaping

    The steel components are cut to the required sizes using cutting techniques like sawing, shearing, or plasma cutting. They are then shaped using processes such as bending, rolling, or pressing to achieve the desired form.

    3. Welding and Joining

    The individual steel components are joined together using welding techniques, such as arc welding or gas welding. This creates strong and secure connections between the different parts of the structure.

    4. Surface Treatment

    The steel components may undergo surface treatments like shot blasting or painting. These treatments help to remove impurities, improve the surface finish, and provide corrosion resistance.

    5. Quality Control and Inspection

    Throughout the processing stages, quality control measures are implemented to ensure that the components meet the required standards and specifications. Inspections are conducted to identify any defects or inconsistencies that need to be addressed.

    Prefabricated Metal Aircraft Hangars Painted Galvanized SurfacePrefabricated Metal Aircraft Hangars Painted Galvanized Surface


    Packaging and Shipping


    Packaging Detail:

    The main steel frame will be securely packed using steel pallets, providing enhanced protection during transportation. This packaging method allows for efficient loading and unloading as the entire frame can be handled as a single unit. Additionally, it helps optimize container space, reducing the number of shipping containers required and resulting in cost savings for ocean freight.
    Other components such as steel purlins and steel sheets will be carefully packaged in parcels. These parcels will be certainly loaded into containers, ensuring safe and convenient handling throughout the shipping process.

    Prefabricated Metal Aircraft Hangars Painted Galvanized Surface


    Our Service


    Services of Xinguangzheng Group
    Our company can design, fabricate, load and erect the PEB steel structure hangar according to clients’ need.
    1. Make suitable design plan and detail construction drawings of PEB steel structure hangar according to the land layout area and usage of building by Tekla, PKPM, 3D3S.
    2. PEB steel structure hangar consultation service.
    3. Budget offers of steel hangar for contractor.
    4. Transportation & delivery as your need.
    5. Fabrication,shot blasting & painting as different request.
    6. Erection & installation of PEB steel structure hangar. Our technician and skilled workers can be on site to guide or install the building as need.

    Prefabricated Metal Aircraft Hangars Painted Galvanized Surface

    Prefabricated Metal Aircraft Hangars Painted Galvanized SurfacePrefabricated Metal Aircraft Hangars Painted Galvanized Surface


    Customers Visit


    We warmly welcome all visitors to our factory for a firsthand experience of our operations. We believe that a factory tour will instill greater confidence in our potential collaboration. By witnessing our state-of-the-art facilities, advanced technologies, and skilled workforce in action, you will gain a comprehensive understanding of our commitment to quality and excellence.

    We look forward to hosting you and establishing a mutually beneficial partnership based on trust and confidence.

    Prefabricated Metal Aircraft Hangars Painted Galvanized Surface


    FAQ


    1. Who you are?

    We are a global one-stop manufacturer of steel structure building.
    We can offer the service from good design to installation with good quality.

    2. How can I get the quotation of the project?

    If you have drawing, we can offer quotation accordingly. If you don't have design, we will design some drawings for your confirmation, and then offer quotation.

    3. Do you offer design service?

    Yes, we could design full solution drawings. Utilizing AutoCAD, PKPM, MTS, 3D3S, Tarch, and Tekla Structures (Xsteel), we can design complex industrial buildings like office building, super market, car shop, shopping mall and so on.

    4. How do you ensure your quality?

    One side,we have a strict quality control system in our factory, which conforms to the ISO9000 quality certification system.
    The other side, we support the inspection before shipment by SGS,BV CCIC and other certification.

    5. What is your terms of payment?

    30% deposit is paid in advance, and the balance is paid before shipment; it can be negotiated according to specific projects.

    Quality Prefabricated Metal Aircraft Hangars Painted Galvanized Surface for sale
    Inquiry Cart 0
    Send your message to this supplier
     
    *From:
    *To: Qingdao Xinguangzheng Xinyuan Construction Engineering Co., Ltd.
    *Subject:
    *Message:
    Characters Remaining: (0/3000)